Which asbestos class do I need in Georgia?
Licenses firms, not people. A class is set only for supervisors.
Georgia licenses contractor firms, not people, and its rule sets a class only for supervisors, on jobs with crumbling (friable) material; homes are covered. For workers the state sets no class: the federal rules apply. Inspectors need current training from an EPA-accredited provider.
Federal rule
Five federal job types: Worker, Supervisor, Inspector, Management planner, Project designer. Many states add their own, often for air monitoring. Other work around asbestos: 2 hours: custodians and maintenance staff who work near it without disturbing it (awareness). 16 hours: maintenance and repair work that disturbs it. 8 hours: removing one kind of material, such as roofing, flooring, siding, ceiling tiles, or transite panels. If it needs barriers or negative pressure: the 4-day worker class. A trained person on site at a regulated demolition or renovation, retrained every 2 years. The school district’s designated person: training required, no set hours. People who analyze air samples: the NIOSH course, or one equal to it.
Source: Rule 391-3-14-.04, .05; agency FAQ (the rule text shows no amendment dates; the dates inside it refer to 1996). Checked November 25, 2026.
How many hours is the initial asbestos class in Georgia?
Rule: 32 hours for supervisors; the agency asks for 40.
The rule says 32 hours or more for the supervisor class, with a test passed at 70 percent. The agency’s own guide and FAQ ask for the 40-hour class, as in the federal rule.
Federal rule
Initial class, federal minimum: Worker 4 days (32 hours); Supervisor 5 days (40 hours); Inspector 3 days (24 hours); Project designer 3 days (24 hours); Management planner 2 days (16 hours) plus the inspector class. The state where the work is done may add more.
Source: Rule 391-3-14-.06(1); agency guide and FAQ (the rule text shows no amendment dates; agency guide marked “Aug-19”). Checked November 25, 2026.
When does my asbestos certificate expire in Georgia?
Every year, within 12 months: no grace period.
A refresher of 8 hours or more every year. It must be finished within 12 months of your last training: no grace period.
Source: Rule 391-3-14-.06(1)(b) (the rule text shows no amendment dates; the dates inside it refer to 1996). Checked November 25, 2026.
Can I take an asbestos class by webinar or self-paced in Georgia?
Two providers offer an internet refresher; kind not said.
The rule does not say. The state’s list of approved providers marks two of them (as best we could read it) as offering a refresher over the internet, without saying whether by webinar or self-paced, and no written conditions were found. Nothing found allows an initial class that way.
Initial class: not said by the stateRefresher: over the internet; the kind is not said
Source: State agency list of approved training providers (list as of September 2026). Checked November 25, 2026.
Does asbestos training from another state count in Georgia?
Only Georgia- or EPA-approved providers; other states’ approval not recognized.
Georgia does not recognize another state’s approval of a class. The provider must be approved by Georgia or directly by EPA; providers in more than a dozen other states are on Georgia’s list. A contractor’s or foreman’s license from a state with standards no lower than Georgia’s is honored, if that state honors Georgia’s.
Source: State agency list of approved training providers; rule 391-3-14-.07(2) (list as of September 2026; the rule text shows no amendment dates). Checked November 25, 2026.
Do I need a state license after the class in Georgia?
Nothing for you; the contractor firm needs a license.
Nothing from the state for you: Georgia issues no personal license or certificate, and there is no state exam. The contractor firm needs a license ($100 for up to three years).
Source: Rule 391-3-14-.04; agency guide and FAQ (the rule text shows no amendment dates; the dates inside it refer to 1996). Checked November 25, 2026.
Who can teach an asbestos class in Georgia?
Nothing of its own; the class needs the director’s approval.
Same as federalGeorgia’s rule sets nothing of its own for instructors. The class must be approved by the state agency’s director.
Federal rule
Under the federal plan, EPA or the state approves each instructor before they teach, based on their schooling or field experience in asbestos work. Each state sets its own rules for instructors. Some approve every instructor one by one.
Source: Rule 391-3-14-.06(2)(b) (the rule text shows no amendment dates; the dates inside it refer to 1996). Checked November 25, 2026.
What paperwork do I need in Georgia?
Supervisor’s training proof and contractor’s license at every job site.
Proof of the supervisor’s training, and a copy of the contractor’s license, must be at every job site for the state to see. Georgia adds nothing on what a certificate must show.
Source: Rule 391-3-14-.04(2), .05(2) (the rule text shows no amendment dates; the dates inside it refer to 1996). Checked November 25, 2026.